CLEVELAND -- Your connection to traffic conditions and incident reports from WTAM 1100 Total Traffic and wkyc.com for Wednesday, April 24, 2013.
I-71
No delays, no incidents reported
I-76
No delays, no incidents reported
Construction:
• Medina County: Eastbound down to ONE LANE from S.R. 57 to Medina/Summit county line through Sept. 2013
• Wadsworth: EB on-ramp closed at Rt 261 through October.
I-77
No delays, no incidents reported
Construction:
• Canton: Roadway reduced to two lanes NB/SB between Tuscarawas/Stark County Line and Fohl St/Exit 99 through September for road resurfacing.
I-80 (Ohio Turnpike)
No delays, no incidents reported
I-90
No delays, no incidents reported
Construction:
• Ashtabula County: Various LANE RESTRICTIONS eastbound and westbound east of S.R. 84 (Conneaut River bridge) to PA state line until Oct. 2013
• Lorain County: Down to TWO LANES EB & WB, east of S.R. 57 through Nov. 2013
• Avon/Westlake: Down to TWO LANES EB, from S.R. 83 to Crocker/Bassett roads
I-271
No delays, no incidents reported
I-480
No delays, no incidents reported
S.R. 2
No delays, no incidents reported
S.R. 176 (Jennings Freeway)
No delays, no incidents reported
U.S. 422
No delays, no incidents reported
Downtown Cleveland
No delays, no incidents reported
Construction:
• Harvard Ave/Harvard Rd bridge closed EB/WB between E 100th St and E 103rd St. through October 2013 as crews replace the bridge structure over the railroad tracks. Drivers will be detoured via East 93rd Street, Miles Avenue and Martin Luther King Jr. Drive to avoid the closure.
• EASTBOUND TRAFFIC ONLY on Cedar Ave. from E. 89th St. to MLK Jr. Dr.; westbound traffic detours to Carnegie Ave. until June 2014
• E. 21st St. on ramp to I-77 SB CLOSED until both Innerbelt Bridges are completed (approx. 2016)
• Ontario St. on ramp to Innerbelt south/west CLOSED until late July 2013
• Abbey Ave. exit from Innerbelt south/west CLOSED until late 2013
Downtown Akron
No delays, no incidents reported
Construction:
• Memorial Pkwy. will be reduced to one lane in each direction at the Cuyahoga Valley Scenic Railway bridge, west of Hickory St., until approximately April 19, 2013, in preparation for replacement of the bridge.
• Akron: Road reconstruction scheduled to leave one lane getting by in each direction through late July on W. Wilbeth Rd, both EB/WB between S Manchester Rd Byp and Dallas Ave
Other Construction Notes
• Westlake: Bridge demolition work on Detroit Rd in both directions, west of Clague Rd. Bridge Replacement over Sperry Creek scheduled to leave only one lane getting by in each direction through late October.
• Canton: Dueber Ave SW closed in both directions over I 77 (US 62) for bridge repairs through late June. The detour is Bolivar Rd to Sherman Church Ave to SR 627.
• Gates Mills/Mayfield Heights: Mayfield Rd closed WB between County Line Rd and Rt 91/Som Center Rd until July.
• Dover: W Wilbeth Rd EB/WB down to one lane in each direction between S Manchester Rd Byp and Dallas Ave through late July
• Macedonia: Highland Rd. EB/WB CLOSED west of Roll And Hold Pkwy. for work on railroad tracks though mid-Oct. 2013
• Avon: Lear Nagle Rd. CLOSED NB/SB on I-90 overpass for new interchange construction through Sept. 2013
• Mentor: Heisley Rd. (S.R. 44) CLOSED over S.R. 2 through mid-Oct. 2013; expect periodic daily LANE CLOSURES on S.R. 2 under Heisley Rd. during off-peak travel hours
WKYC-TV
Anda sedang membaca artikel tentang
Traffic Report: Wednesday, April 24, 2013
Dengan url
http://yunontonbareng.blogspot.com/2013/04/traffic-report-wednesday-april-24-2013.html
Anda boleh menyebar luaskannya atau mengcopy paste-nya
Traffic Report: Wednesday, April 24, 2013
namun jangan lupa untuk meletakkan link
Traffic Report: Wednesday, April 24, 2013
sebagai sumbernya
0 komentar:
Posting Komentar