Traffic Report: Thursday, April 11, 2013

Written By kolimtiga on Kamis, 11 April 2013 | 17.04

CLEVELAND -- Your connection to traffic conditions and incident reports from WTAM 1100 Total Traffic and wkyc.com for Thursday, April 11, 2013.

Weather Note: Rain is expected in the area throughout the morning. Use caution on the wet roads.

I-71

No delays, no incidents reported

I-76

No delays, no incidents reported

Construction:
• Medina County: Eastbound down to ONE LANE from S.R. 57 to Medina/Summit county line through Sept. 2013

I-77

No delays, no incidents reported

I-80 (Ohio Turnpike)

No delays, no incidents reported

I-90

No delays, no incidents reported

Construction:
• Ashtabula County: Various LANE RESTRICTIONS eastbound and westbound east of S.R. 84 (Conneaut River bridge) to PA state line until Oct. 2013
• Lorain County: Down to TWO LANES EB & WB, east of S.R. 57 through Nov. 2013
• Avon/Westlake: Down to TWO LANES EB, from S.R. 83 to Crocker/Bassett roads

I-271

No delays, no incidents reported

I-480

No delays, no incidents reported

S.R. 2

No delays, no incidents reported

S.R. 176 (Jennings Freeway)

No delays, no incidents reported

U.S. 422

No delays, no incidents reported

Downtown Cleveland

No delays, no incidents reported

Construction:
• Harvard Ave/Harvard Rd bridge closed EB/WB between E 100th St and E 103rd St. through October 2013 as crews replace the bridge structure over the railroad tracks. Drivers will be detoured via East 93rd Street, Miles Avenue and Martin Luther King Jr. Drive to avoid the closure.
• Fairfield Ave will be closed under I-90 through Friday April 12. Drivers should use Kenilworth or Starkweather as a detour.
• EASTBOUND TRAFFIC ONLY on Cedar Ave. from E. 89th St. to MLK Jr. Dr.; westbound traffic detours to Carnegie Ave. until June 2014
• E. 21st St. on ramp to I-77 SB CLOSED until both Innerbelt Bridges are completed (approx. 2016)
• Ontario St. on ramp to Innerbelt south/west CLOSED until late July 2013
• Abbey Ave. exit from Innerbelt south/west CLOSED until late 2013

Downtown Akron

No delays, no incidents reported

Construction:
• Memorial Pkwy. will be reduced to one lane in each direction at the Cuyahoga Valley Scenic Railway bridge, west of Hickory St., until approximately April 19, 2013, in preparation for replacement of the bridge.
• Akron: Road reconstruction scheduled to leave one lane getting by in each direction through late July on W. Wilbeth Rd, both EB/WB between S Manchester Rd Byp and Dallas Ave

Cuyahoga County Notes

Brecksville: Riverview Road in Brecksville closed due to flooding

Medina County Notes

Medina: N Carpenter Rd closed NB/SB between Grafton Rd and Boston Rd due to flooding

Other Construction Notes

• Dover: W Wilbeth Rd EB/WB down to one lane in each direction between S Manchester Rd Byp and Dallas Ave through late July
• Macedonia: Highland Rd. EB/WB CLOSED west of Roll And Hold Pkwy. for work on railroad tracks though mid-Oct. 2013
• Avon: Nagle Rd. CLOSED NB/SB on I-90 overpass for new interchange construction through Sept. 2013
• Mentor: Heisley Rd. (S.R. 44) CLOSED over S.R. 2 through mid-Oct. 2013; expect periodic daily LANE CLOSURES on S.R. 2 under Heisley Rd. during off-peak travel hours

WKYC-TV


Anda sedang membaca artikel tentang

Traffic Report: Thursday, April 11, 2013

Dengan url

http://yunontonbareng.blogspot.com/2013/04/traffic-report-thursday-april-11-2013.html

Anda boleh menyebar luaskannya atau mengcopy paste-nya

Traffic Report: Thursday, April 11, 2013

namun jangan lupa untuk meletakkan link

Traffic Report: Thursday, April 11, 2013

sebagai sumbernya

0 komentar:

Posting Komentar

techieblogger.com Techie Blogger Techie Blogger